Project Description
This is a cluster of projects to fill in gaps in sidewalks and walkways to expand the network of routes for pedestrians in the area surrounding 128th Street SW. New construction will occur in up to 12 locations that have substandard or nonexistent portions of the pedestrian facility. Most areas with relatively new improvements will be designed to urban standards with new curb, gutter and sidewalk. In some areas with only existing gravel shoulder, the roadway will be widened to include an interim walkway with the assumption that developer improvements will occur at a later date.
Contacts
* Construction schedules are subject to change based on a number of factors that include the availability of funding, length of the permitting process, coordination with other agencies, and weather.