Snohomish County Washington
Snohomish County Washington Public Works Surface Water Management
Click to search 
Public Works Surface Water Management
View Printer Friendly Page
Public Works Surface Water Management
Public Works
PW Divisions
Surface Water
Work Areas
Urban Drainage
Complaints
Inspections
Publications
116th St SE
12th Ave NW Culvert
132nd Street NE
15th Ave NE Culvert Replacement
175th St SW
61st Ave SE
6th Ave West
8009 Robe Menzel Road
Broadway Ave
Maltby Community Park
Willow Drive

logo Shortcuts
tree iconRelated Links
tree iconRelated Media
tree iconRelated Maps
tree iconRelated Services

Home  >  Departments  >  Public Works  >  PW Divisions  >  Surface Water  >  Work Areas  >  Urban Drainage  >  Silver Crk WQFP Study

 

Surface Water Management Division

 

Silver Creek WQFP Pilot Study

 

Natural Drainage Project: Roadside Ditch Enhanced with Rain Garden

 

Silver Creek Pilot Projects
Starting in 2009, Surface Water Management (SWM) plans to conduct a WQFP pilot study in the Silver Creek watershed. This study will involve:

  • Collecting citizen input on the design and location of proposed pilot projects,
  • Recommending drainage projects and maintenance actions that the County can complete to improve water quality,
  • Implementing pilot projects as funding allows, and
  • Using study results to guide work in other areas of the county.

The Silver Creek WQFP pilot study will assess both traditional and innovative techniques to manage and treat stormwater runoff. It will include the installation of Natural Drainage features, taking advantage of natural processes wherever possible to minimize disruptions to natural water movement.

Natural Drainage Features
Proposed pilot projects in the Silver Creek watershed include one or more of the following Natural Drainage features:

  • Rain gardens
  • Rain garden terraces
  • Soil amendments
  • Vegetated strips
  • Pervious pavement
  • Reduced pavement
  • Vegetated swales
  • Roadside ditch amendments

Please see the pilot project summaries posted on this page to see proposed projects that incorporate these features.

Natural Drainage Project: Rain Garden Terraces

 

Silver Creek Watershed: Focus Areas
The Silver Creek watershed was chosen as the location for the WQFP pilot study largely because it’s a good example of areas within the county that have several small creeks, and are developing quickly. Within the Silver Creek watershed, SWM has identified several focus areas for pilot projects. Click here to view a map showing the locations of these focus areas.
  
Pilot Study Goals
The short-term goal of the Silver Creek WQFP pilot study is to identify and implement effective water quality improvement strategies in the watershed, including projects and maintenance actions. The long-term goal of the study is to develop a model that can be applied to other areas of the county.

(back to top)

 

 

 

 

Pilot Project Summaries

Map of pilot project focus areas and locations.

 

Natural Drainage Project: Rain Garden

 

  Contact SWM  

Craig Young
SWM Project Specialist
Phone: 425-388-6464
Email: c.young@snoco.org

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Snohomish County, Online Government Information & Services

County Home | Contact Us | Phone Numbers | Privacy Statement | Site Information | Feedback | Directions