Surface Water Management Division
North Creek Drainage Needs Report
December 2002
These documents are in pdf format, which requires the FREE Adobe Acrobat Reader Program in order to be viewed.
Cover and Table of Contents
Executive Summary
1.0 - Introduction
2.0 - Basin Characteristics
3.0 - Hydrologic and Hydraulic Modeling
4.0 - Habitat Assessment
5.0 - Water Quality Assessment
6.0 - Channel Erosion Assessment
7.0 - CIP Design Guidelines
8.0 - Existing and Future Problems
9.0 - CIP Development, Alternatives Analysis and Recommended Solutions
10.0 - Recommended Plan
11.0 - References
Appendix A - Hydrologic Model Development and Application
Appendix B1 - Hydraulic Model Development and Application for Penny Creek
Appendix B2 - Hydraulic Model Development and Application for Silver/Nickel Creek
Appendix B3 - Hydraulic Model Development and Application for North North Creek
Appendix B4 - Hydraulic Model Development and Application for Middle 1 North Creek
Appendix B5 - Hydraulic Model Development and Application for Middle 2 North Creek
Appendix B6 - Hydraulic Model Development and Application for South North Creek
Appendix C - Habitat Surveys, Data Analysis and Results
Appendix D - Water Quality Data and Results
Appendix E - Geomorphic Channel Evaluation
Appendix F - Project Summary and Cost Estimates - Introduction
Appendix F - Project Summary and Cost Estimates - Middle 1 North Creek
Appendix F - Project Summary and Cost Estimates - Middle 2 North Creek
Appendix F - Project Summary and Cost Estimates - North North Creek
Appendix F - Project Summary and Cost Estimates - Penny Creek
Appendix F - Project Summary and Cost Estimates - Silver Creek
Appendix F - Project Summary and Cost Estimates - South North Creek
Attachment F1 - Property Acquisition Costs
Attachment F2 - CIP Project Scoring